The City of Isle of Palms owns the Isle of Palms Marina located on 80 41st Avenue. The site includes a waterfront restaurant on the Intracoastal Waterway, one of the best breathtaking public restaurant sites in the Lowcountry. The restaurant site includes a dedicated dock space along the Intracoastal Waterway and is adjacent to the Isle of Palms Marina and Market Store.
The City is eager to welcome a partner to create a family friendly restaurant for residents and visitors to enjoy.
After a comprehensive negotiation process, City Council approved a lease with the IOP Families Group, "Marker 116 LLC" for the operation of the IOP Marina Restaurant. The new tenants will renovate the building and plan to open a new restaurant early 2022.
Project Updates
- Construction complete
- Staff coordinating final walkthrough, inspection and report from Insight Group, third party construction management contractor hired by the City to oversee construction and compliance with permits.
- Restaurant opening week of May 9th
- Finishes are complete
- Floors have been sanded and refinished
- Electricians and plumbers are tying all kitchen and bar equipment to be ready for SCDHEC inspection this week
- Building Inspector and Fire Marshall scheduled to conduct a full inspection prior to opening date
- Potholes, resurfacing parking lot and construction of dumpster pads scheduled for this week
- Actual opening date contingent on SCDHEC permit
- Pavers are being installed now
- Power is on in the building
- Floors in the back dining room should be installed next week
- Upstairs floor has been sealed to eliminate leaks below
- Kitchen equipment is arriving now and being installed
- Working to determine dumpster location and whether to use compactor or conventional dumpster
- Expecting to open mid-April
- Kitchen hood has been installed
- Bath partitions being installed now
- Counters tops in bathrooms and bars being installed now
- Cable railing on decks, porches, and stairwells is 90% complete
- Sapele wall panels installed in entryway
- Drywall is finished
- Kitchen walls (FSRP) are finished
- Electrical work finished with exception of connections to mechanical units on roof
- Metal roof is finished
- New entry door is on site and ready to be installed
- Kitchen equipment is being receiving now with additional equipment on the way
- Heating and cooling equipment is 90% complete and being worked on now
- Work in the parking lot and patios begins in the next two weeks
- Working to determine dumpster location and whether to use compactor or conventional dumpster
- If equipment is delivered on schedule, plan to open mid-March
Building Update
- Electrical handhole has been swapped by Dominion with a flush mount box for new service
- Electrical – waiting on the delivery of the main distribution panel
- HVAC ductwork complete and all units are installed on the roof
- Kitchen hood delivered and starting install
- Bathroom tile is complete except accent tile over the counters
- Starting construction on bathroom counter and toilet partition
- Drywall is almost 100% and all FRP is installed in the kitchens and server areas
- Plan to start ceiling grid week of January 24
- Interior shiplap and trim is complete
- Finishing out entry trim work and bars in the next 2-3 weeks
- Starting interior paint week of January 24
- Metal roof almost complete - trim should be completed next week
- Exterior pavers starting the week of January 24
- Back deck cable rails in progress—switching to front areas after completion
- Wood flooring scheduled for 2nd week in February
Building Update
- Siding installation complete
- Metal mansard roof installation begins week of 11/15
- AC units will get craned to the roof week of 11/15
- Sprinkler and HVAC duct work scheduled to be complete week of 11/15, which will allow ceiling work to begin
- Spray foam is 70% complete
- Kitchen wall covering installation is in process
- Ongoing discussions regarding plan to consolidate enclosed dumpster area between the end of road at 41st Avenue and employee parking lot. On site meeting scheduled for week of 11/15
Restaurant Dock Improvements
- Complete